close
close

Chennai Live: Partial cancellation of express trains due to engineering work at Tirupati station!, engineering work at Tirupati station, line blockage/signal blockage, passenger safety, operational safety of trains, partial cancellation of express train services, train no. 16057 (Chennai Central

Chennai Live: Partial cancellation of express trains due to engineering work at Tirupati station!, engineering work at Tirupati station, line blockage/signal blockage, passenger safety, operational safety of trains, partial cancellation of express train services, train no. 16057 (Chennai Central

Chennai Live: Partial cancellation of express trains due to engineering work at Tirupati station!, engineering work at Tirupati station, line blockage/signal blockage, passenger safety, operational safety of trains, partial cancellation of express train services, train no. 16057 (Chennai Central

During the ongoing engineering works prioritizing passenger safety and safe train operations, one line block/signal block will be permitted in Tirupati railway station from May 15 to 31, 2024. As a result, there will be changes to express train services:

Partial cancellation of express train services:

1. Train No. 16057, Chennai Central – Tirupati Sapthagiri Express, departing from Chennai Central at 06:25, will be partially canceled between Ron*tante and Tirupati from May 15 to 31, 2024.

2. Train No. 16058, Tirupati – Chennai Central Sapthagiri Express, departing from Tirupati at 6:05 p.m., will be partially canceled between Tirupati and Renigunta from May 15 to 31, 2024.

3. Train No. 16053, Chennai Central – Tirupati Express departing from Chennai Central at 2:25 p.m., will be partially canceled between Renigunta and Tirapati from May 15 to 31, 2024.

4. Train No. 16054, Tirupati – Chennai Central Express, departing from Tirupati at 10:10 am, will be partially canceled between Tirupati and Renigunta from May 15 to 31, 2024.

Post your requirement – We will connect with the right supplier or service provider